Road Projects

  1. Asphalt Package 2018-1 – Repair portions of Jarvis Road, Juergen Road, Old Mueschke Road, Huffmeister Road, Cypress North Houston, and Mile Drive
  2. John Paul Landing – North Bank Channel Excavation & Central Cell Pedestrian Bridge
  3. Grant Road from Lakewood Forest to Old Kluge - Construction of a 4-lane boulevard
  4. Telge Road from Spring Cypress to Little Cypress Creek - Construction of a 4-lane boulevard
  5. Porter Road from Franz to 0.5 miles north of Franz – Reconstruct 2-lane roadway
  6. Porter Road from 0.5 miles north of Franz to Morton Ranch – Reconstruct 2-lane roadway
  7. Mueschke Road from Grand Parkway to 2700’ South of Draper – Construction of a 4-lane boulevard
  8. Cypress Rose Hill Road from Grand Parkway to 0.5 miles north of Channel M128 - Construction of a 4-lane boulevard

Traffic Projects (Intersection & Signal)

  1. Huffmeister at Tuckerton – Intersection improvement project to construct an extension of the northbound left turn lane and adding a southbound right turn lane
  2. Mason at Cumberland Ridge/Schiel – Construction of a traffic signal system
  3. Mason at Katybriar – Construction of a traffic signal system

Projects Completed in the Last Six Months

  1. Sidewalk along Greenhouse Road – Construct Sidewalk along Greenhouse Road from Langham Creek North to Town Lake Greene Drive
  2. Cypress Rose Hill from 0.5 miles north of channel M128 to Seidel Cemetery – Construction of a 4-lane boulevard
  3. Cypresswood at Louetta – Construction of a traffic signal system
  4. Park Row at Primewest Parkway – Construction of a traffic signal system
  5. Morton Ranch at Elrod (North) – Construction of a traffic signal system
  6. Asphalt Overlay package Pitts – Repair portions of Pitts Road from South of Clay Road to FM 529
  7. Mueschke from Juergen to Grand Parkway - Construction of a 4-lane boulevard
  8. Addicks Clodine from Alief Clodine to Westpark - Remove and replace damaged pavement
  9. Barker Cypress at Morton/Groschke – intersection improvement project to add northbound dual left turn lane
  10. Fry Road at Chilton Bluff/Maircopa Ridge – Construction of a traffic signal system
  11. Westgreen Blvd at Park Row Dr – Intersection improvement project to add longer left turn lanes and a westbound right turn lane
  12. Clay Road from Deerfield Village to Pine Forest Green – Overlay, drainage and safety improvements
  13. Fry at Stockton Falls/CannonFire - construction of a traffic signal system
  14. Mason at Franz – Intersection improvement project to construct dual left turn lanes on the northbound and southbound approaches and right turn lanes on the eastbound and westbound approaches
  15. Asphalt overlay package 2017-3 – Repair portions of Kickapoo, Kermier, Hegar, and Katy Hockley Cut Off Road
  16. Asphalt overlay package 2017-2 - Repair portions of Becker Road, Bauer Hockley Road, Roberts Road, and Betka Road
  17. Decker Prairie Rosehill Bridge - Bridge erosion repair project
  18. Telge at Tuckerton - reconstruction of existing Telge Road pavement, adding northbound and southbound right turn lanes and an eastbound dual left turn along with related signal modifications

For suggestions or comments regarding this site please email us at webmaster@pct3.com. For employee access to Outlook click here.

The information contained in this site was valid at the time of posting. Harris County assumes no liability for damages incurred directly or indirectly as a result of errors, omissions or discrepancies.
Moreover, Harris County is not responsible for the content nor endorses any site which has a link from this page.
For additional information please review our Privacy Policy and our Accessibility Statement.