Road Projects

  1. West Little York from Westfield Creek to Eagle Sky - Construction of future east bound lanes to complete a 4-lane boulevard
  2. West Road from West of Katy Hockley Cut Off Road to Peek Road - Construction of a 4-lane boulevard
  3. Mueschke from Juergen to Grand Parkway - Construction of a 4-lane boulevard
  4. Grant Road from Lakewood Forest to Old Kluge - Construction of a 4-lane boulevard
  5. Cypress Rose Hill from Lake Cypress Hill to SH-99 - Construction of a 4-lane boulevard
  6. Telge Road from Spring Cypress to Litte Cypress Creek - Construction of a 4-lane boulevard
  7. Bissonnet from County Line to Eldridge – Remove and replace damaged pavement
  8. Clay from Wood Pine to Barker Cypress – Widen 4-lane bridge
  9. Cypress Rose Hill from 0.5 miles north of channel M128 to Seidel Cemetery – Construction of a 4-lane boulevard
  10. Addicks Clodine from Alief Clodine to Westpark - Remove and replace damaged pavement
  11. Decker Prairie Rosehill Bridge - Bridge erosion repair project
  12. Asphalt overlay package 1 - Repair portions of Katy Hockley Road, Katy Hockley Cut Off Road, and Peek Road
  13. Asphalt overlay package 2 - Repair portions of Becker Road, Bauer Hockley Road, Roberts Road, and Betka Road
  14. Cypress Rose Hill Road from Grand Parkway to 0.5 miles north of Channel M128 - Construction of a 4-lane boulevard

Traffic Projects (Intersection & Signal)

  1. Fry at Saums Road - Construction of a safety improvement project as well as dual left turn lane (westbound) and a northbound right turn lane with related traffic signal modifications
  2. Fry at Cypress North Houston / North Bridgeland Lake - Increased intersection capacity project
  3. Telge at Tuckerton - reconstruction of existing Telge Road pavement, adding northbound and southbound right turn lanes and an eastbound dual left turn along with related signal modifications – Project placed on temporary hold until flooded roads are re-opened to traffic
  4. Mason at Clay - Left turn lane extension and median nose repair
  5. Fry at Clay Rd. - Intersection improvement project to add longer left turn lanes and a southbound right turn lane
  6. Fry at Stockton Falls/CannonFire - construction of a traffic signal system
  7. Westgreen at Wheat Snow - construction of a traffic signal system

Projects Completed in the Last Six Months

  1. Louetta from US 290 to Oblong Circle – Construction of a 4-lane boulevard
  2. Tuckerton Road at Point Park Drive - Construction of a traffic signal system
  3. Tuckerton Road at Queenston Boulevard - Increased intersection capacity project
  4. West at Queenston - Construction of a dual left turn lane westbound and a northbound right turn lane with related traffic signal modifications
  5. Louetta from Stablefield Lane to Stablewood Farms – Construction of future eastbound lanes to complete 4-lane boulevard
  6. Howell Sugarland Road at Renn Road - Construction of a traffic signal system
  7. Mueschke Road at Tacoma Springs Drive/Towering Cypress Drive - Construction of a traffic signal system

For suggestions or comments regarding this site please email us at webmaster@pct3.com. For employee access to Outlook click here.

The information contained in this site was valid at the time of posting. Harris County assumes no liability for damages incurred directly or indirectly as a result of errors, omissions or discrepancies.
Moreover, Harris County is not responsible for the content nor endorses any site which has a link from this page.
For additional information please review our Privacy Policy and our Accessibility Statement.