Road Projects

roadandbridge.png

Road and Bridge

Harris County Precinct 3 maintains over 1,300 miles of roadways and associated bridges throughout the area. Maintenance includes road reconstruction, storm debris removal, sign installation, right of way mowing, and more. Browse the categories below for more information.

Road Projects

Asphalt Package 2019-2
Repair Portions of Clay Road between Highway 6 and Fry Road. Intersection Improvements at Clay Road at Greenhouse Road to construct westbound right turn lane and southbound dual left turn lanes
Asphalt Package 2018-3
Repair Portions of Bauer Road, Bauer Hockley Road, Roberts Road, Waller Tomball Road, and Robert Cemetery Road
John Paul Landing
John Paul Landing Central Cell Excavation
Peek Road from 600’ North of Clay Road to Grand Ventana Drive
Construction of a 4-lane concrete boulevard
John Paul Landing
North Bank Channel Excavation & Central Cell Pedestrian Bridge
Telge Road from Spring Cypress to Little Cypress Creek
Construction of a 4-lane boulevard
Mueschke Road from Grand Parkway to 2700’ South of Draper
Construction of a 4-lane boulevard
Porter Road from Franz to 0.5 miles north of Franz
Reconstruct 2-lane roadway
Porter Road from 0.5 miles north of Franz to Morton Ranch
Reconstruct 2-lane roadway
Grant Road from Lakewood Forest to Old Kluge
Construction of a 4-lane boulevard
Cypress Rose Hill Road from Grand Parkway to 0.5 miles north of Channel M128
Construction of a 4-lane boulevard
Cypress North Houston from Cypress Creek bend to Greenhouse
Construct 2-lanes to complete 4-lane boulevard

Traffic Projects (Intersection & Signal)

Queenston at French
replacement of an existing wood pole traffic signal system
Cypress North Houston Road at Cypress Creek Bend Drive
Construction of a traffic signal system
Bellaire Boulevard at Marchena Drive
Construction of a traffic signal system
West Road at Telge Road
Intersection improvement project to construct eastbound dual left turn lanes and southbound dual left turn lanes

Projects Completed in the Last Six Months

Asphalt Package 2018-2
Repair portions of Elrod, Katy Gap Road, Katy Hockley Cut Off Road, Roesner Road, and Old Fry Road
Asphalt Package 2018-4
Repair portions of Baker Road, Saums Road, Dulaney Road, Groschke Road, Ashley Road, Old Greenhouse Road, Pine Forest Road and Clay Road
Asphalt Package 2018-1
Repair portions of Jarvis Road, Juergen Road, Old Mueschke Road, Huffmeister Road, Cypress North Houston, and Mile Drive
Asphalt Package 2019-1
Repairs portions of Field Store Road, Stokes Road, and Waller Spring Creek Road
Greenhouse at Cypress Bay
Construction of a traffic signal system