Road Projects

roadandbridge.png

Road and Bridge

Harris County Precinct 3 maintains over 1,300 miles of roadways and associated bridges throughout the area. Maintenance includes road reconstruction, storm debris removal, sign installation, right of way mowing, and more. Browse the categories below for more information.

Road Projects

Cypress North Houston from Greenhouse to Barker Trace
Construct 2-lanes to complete 4-lane boulevard
Asphalt Package 2019-3
Repair Clay Road between Fry Road and Peek Road and Porter Road between Stockdick School Road and Morton Ranch Road
Mound Road from Fry to Crossland Park Lane
Construct 2-lanes to complete 4-lane boulevard
Cypress North Houston from Cypress Creek Bend to Greenhouse
Construct 2-lanes to complete 4-lane boulevard
Peek Road from 600’ North of Clay Road to Grand Ventana Drive
Construction of a 4-lane boulevard
Asphalt Package 2019-2
Repair Portions of Clay Road between Highway 6 and Fry Road. Intersection Improvements at Clay Road at Greenhouse Road to construct westbound right turn lane and southbound dual left turn lanes
John Paul Landing
John Paul Landing Central Cell Excavation
Mueschke Road from Grand Parkway to 2700’ South of Draper
Construction of a 4-lane boulevard
Porter Road from Franz to 0.5 miles north of Franz
Reconstruct 2-lane roadway
Porter Road from 0.5 miles north of Franz to Morton Ranch
Reconstruct 2-lane roadway

Traffic Projects (Intersection & Signal)

Morton Ranch Road at Porter/Katy Oaks Boulevard
Construction of a traffic signal system
Queenston at French
replacement of an existing wood pole traffic signal system

Projects Completed in the Last Six Months

Cypress Rose Hill Road from Grand Parkway to 0.5 miles north of Channel M128
Construction of a 4-lane boulevard
Asphalt Package 2018-3
Repair Portions of Bauer Road, Bauer Hockley Road, Roberts Road, Waller Tomball Road, and Robert Cemetery Road
John Paul Landing
North Bank Channel Excavation & Central Cell Pedestrian Bridge
Bellaire Boulevard at Marchena Drive
Construction of a traffic signal system
Asphalt Package 2018-4
Repair portions of Baker Road, Saums Road, Dulaney Road, Groschke Road, Ashley Road, Old Greenhouse Road, Pine Forest Road and Clay Road
Asphalt Package 2018-1
Repair portions of Jarvis Road, Juergen Road, Old Mueschke Road, Huffmeister Road, Cypress North Houston, and Mile Drive
Asphalt Package 2019-1
Repairs portions of Field Store Road, Stokes Road, and Waller Spring Creek Road