Road Projects

roadandbridge.jpg

Road and Bridge

Harris County Precinct 3 maintains over 1,300 miles of roadways and associated bridges throughout the area. Maintenance includes road reconstruction, storm debris removal, sign installation, right of way mowing, and more. Browse the categories below for more information.

Road Projects

Asphalt Rehabilitation – Hockley Area
Repair portions of Old Washington Road, Hegar Road, Kermier Road, Warren Ranch Road, Warren Road, Austin Street, Walker Road, Bell Street, James Street, Camby Street, San Felipe Road, and Kruger Road.
Cypress North Houston from Greenhouse to Barker Trace
Construct 2-lanes to complete 4-lane boulevard
Peek Road from 600’ North of Clay Road to Grand Ventana Drive
Construction of a 4-lane boulevard
John Paul Landing
John Paul Landing Central Cell Excavation

Traffic Projects (Intersection & Signal)

Longenbaugh Road at Canyon Lake Manor Drive/Bridge Park Lane
Construction of a new traffic signal system
Eldridge Parkway at Alief Clodine
Replacement of an existing traffic signal system and extending left turn lanes
Mason Road at Colonial Parkway/Park Row
Replacement of an existing traffic signal system

Projects Completed in the Last Six Months

Asphalt Package 2019-3
Repair Clay Road between Fry Road and Peek Road and Porter Road between Stockdick School Road and Morton Ranch Road
Greenhouse Road at Old Greenhouse Road
Construction of a traffic signal system
Mueschke Road from Grand Parkway to 2700’ South of Draper
Construction of a 4-lane boulevard
Asphalt Package 2019-2
Repair Portions of Clay Road between Highway 6 and Fry Road. Intersection Improvements at Clay Road at Greenhouse Road to construct westbound right turn lane and southbound dual left turn lanes
Morton Ranch Road at Porter/Katy Oaks Boulevard
Construction of a traffic signal system
Queenston at French
replacement of an existing wood pole traffic signal system